stone wall rebuild

The recent project involved the removal of a tree that was impacting the structural integrity of an existing stone wall. Following tree removal, careful excavation work commenced to prepare for the rebuilding of the wall on a more stable foundation. Trenches were meticulously dug to accommodate new footings, ensuring that the wall would be adequately supported and resistant to future movement. This crucial step involved careful consideration of soil conditions and the weight of the wall itself. The excavated trenches were then prepared to receive the new footings, laying the groundwork for the subsequent stages of the wall rebuilding process. This thorough approach ensures the longevity and stability of the newly constructed wall, enhancing the property’s aesthetics and structural integrity.